SWAG Sour-water-alternating-gas injection
Cut cost and enhance recovery
Cost cutting measures are teaming up with enhanced recovery schemes. Injecting sour gas and then alternating with sour water is a good way to increase reserve recovery, save gas processing costs, and dispose of produced water. This applicant convinced the regulator to approve the scheme. She discloses unique conditions where she thinks this scheme will be successful. She also details her injection schedule and pad sizes. We found this using AppIntel.
Each AER application contains your neighbor's perspective on the exploitation of oil and gas formations. Applications contain more technical data even than SPE papers.
Would you like to see what other operators in your areas are thinking about seismic, multifractured wells, polymer schemes and recovery? AppIntel can help.
Subscribers can view this application by pasting the following link into their browser after logging into AppIntel. app.appintel.info/AOW.php?pxnrg=3o757o34313o353138333o386v
Tags: Flood, Cut costs
Granger Low 1 Mar 2016

Sulphur plant turndown
See his process flow diagrams

Saving SAGD OTSG from caustic failure
On the path to increasing water recycle rate

Every drop counts
Saving water while fracking

Save the world by recycling drilling fluids
Reuse as polymer hydrating solution




Calgary, Alberta, Canada
Share