Safely steaming
Assessing geological and wellbore risk
How do you evaluate the risk of flow to surface behind pipe? This application breaks down risk assessment into geological factors and wellbore factors. Both are discussed in detail. A plan to gently steam taking these risks into account includes his steam schedule and wellhead injection pressures. He also discusses the early detection any trouble signs.
Each AER application contains your neighbor's perspective on the exploitation of oil and gas formations. Applications contain more technical data even than SPE papers.
Would you like to see what other operators in your areas are thinking about seismic, commercial schemes, experimental schemes and recovery? AppIntel can help.
Get details of this cool tech Subscribers get them for freeTags: Thermal, Compliance, Heavy Oil
Granger Low 16 Dec 2015

Sulphur plant turndown
See his process flow diagrams

Saving SAGD OTSG from caustic failure
On the path to increasing water recycle rate

Every drop counts
Saving water while fracking

Save the world by recycling drilling fluids
Reuse as polymer hydrating solution




Calgary, Alberta, Canada
Share