Approval only because of tubing change

Operator waited a long time for approval before changing the tubing size.

wellbore schematic With new scrutiny by the AER on maximum well head injection pressure, enhanced recovery schemes are harder to get approved. But this one was approved after a long waiting period when the operator promised to change the tubing size in his injector.

Regulation changes can keep you guessing about how to get applications approved. Proven has submitted over a thousand applications. We know how to get the quickest approval. Can we help?

Subscribers can view this application by pasting the following link into their browser after logging into AppIntel. app.appintel.info/AOW.php?pxnrg=5x787o3239343o313832346262

Tags: Flood

Granger Low  25 May 2015



Evaluating acquisitions

The rest of the story

Disposal or injector

It’s more than just a name

Sulphur plant turndown

See his process flow diagrams

Saving SAGD OTSG from caustic failure

On the path to increasing water recycle rate

Every drop counts

Saving water while fracking

Save the world by recycling drilling fluids

Reuse as polymer hydrating solution

This page last updated 15 May 2026.
Copyright 2011-2026 by Regaware Systems Ltd.
  Calgary, Alberta, Canada
AppIntel is an AI service for getting intelligence from industry submissions vetted by government. Nothing on this page may be construed as engineering or geoscience advice. If you spot any errors on this site, please email our webmaster.
  Share