AER's systems back up

Replaced aging servers

AER logo The Alberta Energy Regulator's website called the Integrated Application Registry came back up today (Mar 1). It had been down for 5 days.

One of the purposes of the outage was to replace aging servers and IP routing schemes.

During that time, no applications were approved by the regulator. Also no orders for past application documents were filled.

During the outage, AppIntel, Regaware's application website was still up and functioning properly. AppIntel subscribers were still able to get applications on demand from AppIntel.

Tags: Regulator

Granger Low  1 Mar 2016



Evaluating acquisitions

The rest of the story

Disposal or injector

It’s more than just a name

Sulphur plant turndown

See his process flow diagrams

Saving SAGD OTSG from caustic failure

On the path to increasing water recycle rate

Every drop counts

Saving water while fracking

Save the world by recycling drilling fluids

Reuse as polymer hydrating solution

This page last updated 15 May 2026.
Copyright 2011-2026 by Regaware Systems Ltd.
  Calgary, Alberta, Canada
AppIntel is an AI service for getting intelligence from industry submissions vetted by government. Nothing on this page may be construed as engineering or geoscience advice. If you spot any errors on this site, please email our webmaster.
  Share