Flood refused by the regulator
Only one issue stood in the way of flood approval.
This applicant did lots of technical work on his application including a black oil simulation model. We found this information using AppIntel.
But the applicant didn't consider this one issue that would stand in the way of flooding his pool. As a result, the AER refused his application.
Proven has submitted over a thousand applications. We know how to submit just enough information to get an approval and not so much information that causes regulator to study it hard. Can we help?
Would you like to see what other operators in your areas are thinking about seismic, multifractured wells, polymer schemes and recovery? AppIntel can help.
Subscribers can view this application by pasting the following link into their browser after logging into AppIntel. app.appintel.info/AOW.php?pxnrg=4d756y31393737373138375x57
Tags: Regulator, Closure, Flood
Granger Low 16 Jun 2015

Sulphur plant turndown
See his process flow diagrams

Saving SAGD OTSG from caustic failure
On the path to increasing water recycle rate

Every drop counts
Saving water while fracking

Save the world by recycling drilling fluids
Reuse as polymer hydrating solution




Calgary, Alberta, Canada
Share