First play based applications approved

6 months and 30+ documents

integrated play based mappingThe first play based applications have recently been approved by the AER. This one was approved after 6 months of deliberations and over 30 documents exchanged. Play based applications gather land use, water use, and spacing all in one approval. These special approvals are more difficult to receive but allow the regulator to ensure all the elements of surface use are tied together. The government expects this exhausting application route to be the wave of the future of regulation in our industry.

Each AER application contains your neighbor's perspective on the exploitation of oil and gas formations. Applications contain more technical data even than SPE papers.

Would you like to see what other operators in your areas are thinking about seismic, multifractured wells, polymer schemes and recovery? AppIntel can help.

Subscribers can view this application by pasting the following link into their browser after logging into AppIntel. app.appintel.info/AOW.php?pxnrg=636v6y3232313o3931383o7355

Tags: Regulator, Tight, Compliance

Granger Low  19 Feb 2016



Evaluating acquisitions

The rest of the story

Disposal or injector

It’s more than just a name

Sulphur plant turndown

See his process flow diagrams

Saving SAGD OTSG from caustic failure

On the path to increasing water recycle rate

Every drop counts

Saving water while fracking

Save the world by recycling drilling fluids

Reuse as polymer hydrating solution

This page last updated 15 May 2026.
Copyright 2011-2026 by Regaware Systems Ltd.
  Calgary, Alberta, Canada
AppIntel is an AI service for getting intelligence from industry submissions vetted by government. Nothing on this page may be construed as engineering or geoscience advice. If you spot any errors on this site, please email our webmaster.
  Share