SAGD approval time dropping

Using maximum time to approval

Chart showing that maximum approval time is dropping for SAGD Comm Scheme Amend Category 2SAGD application are being approved quicker. The average approval time is still the same. But the maximum time for approval has dropped significantly this year.

Maximum approval time indicates the worst case approval and always should be considered in your project schedule.

Maximum approval time is also a measure of your application quality. If your application is approved nearer the max approval time than near the average, your application was written poorly. We found this information using AppIntel.

Comm Amend Category 2 applications are thermal applications with significant changes proposed to a SAGD scheme. Earth shaking amendments are designated as Class 3. Minor changes are Class 1. Class 2 amendments are the most popular.

Would you like to see what other operators in your areas are thinking about seismic, commercial schemes, experimental schemes and recovery? AppIntel can help.

Tags: Regulator, Thermal, Scheduling, Heavy Oil

Granger Low  10 Dec 2015



Evaluating acquisitions

The rest of the story

Disposal or injector

It’s more than just a name

Sulphur plant turndown

See his process flow diagrams

Saving SAGD OTSG from caustic failure

On the path to increasing water recycle rate

Every drop counts

Saving water while fracking

Save the world by recycling drilling fluids

Reuse as polymer hydrating solution

This page last updated 15 May 2026.
Copyright 2011-2026 by Regaware Systems Ltd.
  Calgary, Alberta, Canada
AppIntel is an AI service for getting intelligence from industry submissions vetted by government. Nothing on this page may be construed as engineering or geoscience advice. If you spot any errors on this site, please email our webmaster.
  Share